Home
Product Directory
Construction & Decoration
Partition
Toilet Partitions
Commercial Toilet Partitions
Modern Design Modular 12mm Waterproof HPL Phenolic/Compact Laminate Commercial Toilet Partitions
US$30.00 - 40.00 | 100 Square Meters (MOQ) |
Port:
Huangpu, China
Production Capacity:
30000sqm/Month
Payment Terms:
L/C, T/T, Western Union, Paypal
Guangzhou Longlass New Material Co., Ltd.
Guangdong, China
Last Login Date:
Jul 05, 2025
Business Type:
Manufacturer/Factory, Group Corporation
Main Products:
Solar Reflect Glass, Laminated Glass, Insulating Glass, Screen Printing Glass, Fireproof Glass, Bulletproof Glass, Smart Glass Film, Decorative Glass Film, Pdlc Film
Find Similar Products
Product Description
Company Info
Basic Info.
Model NO.
T011
Condition
New
Color
Customized
Customized
Customized
Certification
ISO9001
Style
Modern, Simple
Material
Wood
Transport Package
Plywood Case
Specification
customized
Origin
Guangdong, China
Product Description
Installation Instruction
Fix adjustable leg
Adjust the horizontel size between the door leaf and door crack.then boreholes In the panel,fix the adjustable leg In lhe appropriate iocation withscrews.Fix comer fastener
Draw a center line on the wall.(generally in the center of two toilet seais)afier that use a drill to bore hoies.embed rubber plug into lhe holes.and then fix the comer fasteners on the wall.Fix front board and middle board
According to the corresponding position of support leg and ccxner fastener.install the comer fasteners on the connect position of front board and middle board.and then connect the front board and middle board as T shapeInitially formed toilet partition
Fix the T shape frame on the corresponding position ofsupport leg and comer fastener with sorews,toilet partition formed.Fix the bar
Fix the bar on the front boa rd,adjust each door crack size.and fix with screws one by one.Install dtxar
First.fix the hinge(no cover)on the door.keep a suitable door crack.tTien fix the hinge(lower part of the hinge)with crews.adjust the hinge to let the door open and class Sreely.Indicator lock.knob
Line ar»d drill on the door or T panel acccording to the hole distance of different locks.adjust the screw of the indicatorFix coat hook,cover the screw cover,hinge cover.check thoroughly again.Toilet partition installation finished
Send your message to this supplier
People who liked this also liked